Ge Gas Turbine Frame 5 Manual //free\\

Includes all elements of the CI, plus the removal of the turbine casing to inspect the components exposed to the highest thermal stresses. This includes the first-stage and second-stage nozzles, turbine buckets, and stator shroud blocks. Non-Destructive Testing (NDT) like dye-penetrant or eddy-current testing is heavily utilized. Major Overhaul (MO)