Saudi Aramco Schedule G Review

is a mandatory contractual attachment integrated into all major In-Kingdom (IK) and Out-of-Kingdom (OOK) construction and engineering contracts. It delineates the exact legal and operational responsibilities between the "Company" (Saudi Aramco) and the "Contractor" regarding how project assets are sourced, tracked, preserved, and handed over.

Quality records (RFI - Request for Inspection) must be digitized and updated in real-time. saudi aramco schedule g

Between 2000 and 2010, Aramco recognized that third-party contractors, who often cut corners on safety to reduce bids, were the weakest link in their operational chain. Schedule G was overhauled to eliminate that weakness. Today, the schedule exists to achieve three specific goals: is a mandatory contractual attachment integrated into all

Unused or damaged company-supplied materials must be disposed of in accordance with instructions from the company representative, often requiring transport to specific locations. 4. Safety and Quality Requirements in Schedule G Between 2000 and 2010, Aramco recognized that third-party

The company provides a listing (often in an attachment) of materials, tools, or equipment it will supply at no cost to the contractor.